Up to Code: Check Your Permits & Codes

Your grand opening won't be so grand if the space you've designed for your paint area doesn't comply with the necessary permit requirements and building codes.

1/1/1998

The grand opening of a new or remodeled shop is one of the brightest moments for a collision repair business. It's the result of a great deal of faith, thousands of dollars, hours of labor and night after night of pacing the floor worrying about the details.

But before the shop opens, an idea is born in the mind of the shop owner - and that idea must be transferred to paper. While not everyone has the luxury of building a brand new shop tailored to their operational needs, those who do often encounter difficulties in the permitting process and, subsequently, generate additional costs with reverse engineering because permit and code issues weren't factored in prior to breaking ground.

Blending a productive traffic flow with permit requirements and building codes is the key to success. A multitude of coding bodies and agencies in the United States, as well as the American Disabilities Act, have an effect on the layout of a shop - and these effects need to be anticipated in the design phase. Just because you've met installation codes for that new spraybooth doesn't mean your shop is "permitted" to use it. The building that houses that spraybooth must also answer to a specific code.

Until there's one code that applies nationwide, it's impossible for this article to address every single issue that can arise in the design, construction and operation of a body shop. But by anticipating permit needs in the earliest stages of the design phase, a shop owner has more control over his destiny - and construction costs.

Zoning

Zoning will make or break a shop - certain areas can be zoned for businesses but not for businesses with spraybooths. For example, zoning can be appropriate for a painting operation but not for the sale of used cars (an issue for auto sales that operate or would like to operate a reconditioning facility). Zoning hearings may be required.

Permit Terms

Parameters, as viewed by zoning and plans review personnel, are defined by the nature of the permit request. For instance, the words "install" vs. "replace" (new or upgrade), "a change in use" (e.g. carpet store to body shop), "transfer of ownership" and "use groups" make all the difference in what's required to obtain permits. It's immaterial as to whether the tenant owns or leases the building. The language on the "Use and Occupancy" permit determines what will actually take place in that building, regardless of building ownership.

Code Authorities

Geography determines what layers of code must be satisfied locally, as well as nationally.

  • The Building Officials and Code Administration International, Inc. (BOCA) and the National Fire Protection Association (NFPA) are the ruling codes in the Midwest, Upper Midwest and Northeast.
  • The Southern Building Code Congress International, Inc. (SBCCI) governs the South as far west as Texas.
  • The International Association of Plumbing and Mechanical Officials (IAMPO) is recognized in 14 Western states, as well as in Maine and Texas, as is the International Conference of Building Officials (ICBO).
  • The Uniform Fire Code (UFC) is recognized west of the Mississippi River.
  • The Occupation Safety and Health Administration (OSHA) relies heavily upon the NFPA throughout most of the United States.

Various miscellaneous agencies, such as those appointed by the cities of Chicago, Philadelphia, New York and the state of North Carolina, are local code authorities that must be considered in the process. One single entity, The National Electrical Code (NEC), is recognized throughout the United States.

Currently, there's a concentrated movement to align all the various codes and produce a single manual by the year 2000 that will be recognized nationwide. While this will eliminate a great deal of confusion, it will also produce opportunity for plans reviewers and fire marshals to pay closer attention to a shop's design and code compliance.

Building Requirements

  • Height and width - This issue is especially critical for shops installing oversized spraybooths for the painting of trucks, buses, construction equipment, fire trucks, limousines, etc. The tail wags the dog in that the building size and access door requirement may increase the original square footage calculated to house the operation.
  • Paint storage and mixing rooms - The codes that cover the mixing and storing of paints often confuse even the plan reviewers. Regardless of geography, the three governing codes are OSHA, NFPA and the appropriate building codes. Should a conflict in codes arise, the most stringent of the three codes will prevail.

The standard for a paint-storage room is based on 150 gallons of paint in storage. It's possible to store more but construction standards will increase, as will fire suppression needs. NFPA has a minimum one-hour burn rating for paint storage; BOCA requires two hours. Also keep in mind that 18-gauge sheet metal is not suitable for construction of paint-storage rooms. NFPA 30 (storage and mixing of flammables) is used by OSHA for the criteria of wall construction and ventilation of paint mixing and storage rooms.

Most prefabricated mixing rooms will meet or exceed the minimum criteria under NFPA 30, but they don't meet criteria for storage under any codes, unless the walls are one-hour rated and carry a UL rating for such. This is subject to local interpretation of the applicable codes - what applies in Kansas may not work in Boston. Also, if the booth is up and finished but the paint storage problem hasn't been addressed, the permit will not be finalized.

  • Prep decks - As a distant cousin of the spraybooth, prep decks are not generally described in code books and must be modified to fall within known parameters, which is accomplished by modifying a prep deck so it resembles and functions similar to an open-face spraybooth. This allows local authorities to use their existing code books to approve a prep deck, which can legally host painting activity. Several manufacturers have already done this.

Reversing the theory, however, isn't possible. Recycling prep decks to be used as spraybooths, under OSHA guidelines (NFPA 33), is neither permitted nor "permitable," since the curtains on a prep deck are fire retardant but not fire rated.

  • Access doors - For each personnel door in a spraybooth, there must be two exits from the building in the immediate vicinity of the spraybooth. These exits must be established specific distances from the personnel doors of the spraybooth. Roll-up doors don't satisfy this criteria.
  • Aisles and access - Code requirements determine the width (varies from 36 inches to 60 inches) of aisles or passageways next to the booth that provide access to emergency exits. The width of these passageways may be negotiable with local authorities if there's consistently only one operator in the booth at any given time. The UFC and NFPA are the prevailing authorities.
  • Floor Pits (spraybooth and prep deck exhaust) - These pits will cradle the duct work that supports the exhaust system of the prep deck or spraybooth in particulate removal. Any concrete pits may require a building inspector's approval.
  • Exhaust Stacks - Ductwork supporting the exhaust stacks must meet specific codes. The position and height of the stack is controlled; the type of stack head required can be very specific; and a spraybooth stack can't be piped in such a fashion that it affects other air-exchange or climate-control technology used by the shop. (One indicator of bad stack height and position is a shop's office air conditioner smelling very much like the inside of the shop's spraybooth.) The height of the exhaust stay may also be determined by the local EPA office or health department.
  • Air-makeup units - Special codes govern the use of direct-fire air-makeup units inside a building, as well as the use of an indirect-fire burner (air supply and vents). Code dictates the area required around a panel box, the gas meter and ductwork.
  • Electric and gas power supplies - These are determined by shop size and equipment and need to be wired/piped accordingly. Some jurisdictions may require such items as panel schedules and gas/electric riser diagrams for a booth permit.

Booth Requirements

  • Lighting - Many choices exist for spraybooth light fixtures. Light fixtures must be faced with tempered or wire-reinforced glass and be properly sealed. Lights used next to a door opening must be Class I, Div. II vapor lights rated for that area. Surface-mounted interior lights must be Class I, Div. I and explosion proof. Recessed-mounted interior lights must be Class I, Div. II and are required to be equipped with switches on the glass panels to control the spray solenoid.
  • Exits - Codes dictate that doors be available in a high hazard area 75 feet in any direction from any point in the spraybooth without common path of travel. The number of personnel doors required in a spraybooth is determined by the length and width of the booth itself. The distance between exits in a spraybooth is a code issue (the minimum requirement for 200 square feet is two doors), and the doors themselves should be 30 to 32 inches wide. These are minimum requirements on such exits.
  • Fire Ratings - Any wall construction in a booth must meet or exceed the requirements of NFPA 33 (1995). Spraybooths must be fabricated of 18-gauge sheet-metal steel and spray rooms must be of one-hour rated firewall construction. The sheet metal can have two walls (sandwiched) with a total metal thickness of 18 gauge (insulation between the walls doesn't count in this calculation). The one exception to this rule is when the wall panel itself carries a UL listing. An excellent example of this would be cooler rooms annexed off the interior of a restaurant; walls of this nature are required by code.

The Perks of Permits

Permits may seem like more of a hassle and a hindrance when you're first trying to get your body shop up and running, but without them, you may not be up and running for long. Getting all your permits in order before you open your doors will ensure that you'll be permitted to stay in business.

Writers Tara L. Munro, compliance administrator, and David L. Hindman, president and technical consultant, are employed by DLH Environmental, a company that provides permitting and testing services to painting/coating professionals. To contact DLH, call (888) 226-6040 or go to (www.dlhe.com).


Comment on this article:
 
Search
 


BodyShop Business is
a Babcox publication
3550 Embassy Parkway
Akron, OH 44333
330-670-1234 • (FAX) 330-670-0874
Advertise      Contact Us      Subscribe      Article Index      Privacy/Terms of Use