Turn any preparation area or CTOF into a Rapid Repair station with the installation of an IRT Overhead Rail System. Fast, convenient and easy to use, the IRT infrared rail system will dramatically increase your facility’s productivity per square foot and reduce cycle time, lowering operating costs and increasing customer satisfaction. Simply reach up and pull the IRT curing heads down, focus on the repair at hand, push the on button, and by the time you’re finished cleaning the spray gun, the coating is fully cured. Average cure time is less than 10 minutes. Run costs measured in pennies, not dollars. For more information, visit www.hedsonna.com.
